Renovation Progress

Upcoming

Renovation of Starling Hall

Nearly $300,000 has been spent so far on the project.

  • Moved the Hall back from the road 35′ +/-
  • Replaced 40′ +/- of rotting silly on Hall
  • Reinforced first floor with new floor joists
  • New foundation with full basement and concrete floor
  • Steel reinforcement beams and posts to stabilize the structure
  • New front entrance to meet building code and replace rotting sills
  • New drilled well, pump and pressure tank
  • New plumbing, hot water tanks and vent piping
  • New underground electrical service to the building
  • New 200 amp entrance and extensive rewiring
  • Capacity available for second 200 amp entrance
  • New heating and air conditioning system

Upcoming

Work that remains to be done

  • New roof
  • New clapboard siding and trim
  • Replace plywood first floor with original wide flooring
  • Upgrade lighting systems
  • Renovate two story outhouse
  • Finish electrical wiring upgrades
  • Install new second floor exit stairway and elevator addition
  • Install new fully ADA compliant handicap accessible restrooms in new addition
  • Reinstall fire alarm systems, emergency lighting and other improvements to meet life safety code requirements
  • Install new fire suppression system
  • Reinforce second floor joists
  • Handicap ramp and landing for access to the first floor
  • Other improvements that may be identified as required by the Maine Unified Building Code and other regulations